How The Dwyer Company Supported New Fuel Tank and Generator Foundations at Dayton Children’s
- Project Type: Commercial
- Project Services: Deep Foundation Systems, Helical Piles
Dayton Children’s added fuel tanks, generators, and gear pads at its Dayton, Ohio campus, on ground carrying soft existing fill through the upper 6 to 8 feet and sitting right beside the existing parking garage. The Dwyer Company installed 46 helical piers to support the new equipment foundations, working with general contractor Danis and engineers Shell & Meyer and Civil Solutions. Each pier carries a maximum load of 25 kips. The full scope went in over five days.
Setting equipment foundations beside a structure you cannot disturb?
Quick Facts
- Dayton, Ohio
- Project Type: Commercial – New Construction
- Timeline: 5 weeks
- Owner: Dayton Children’s
- Structure: New fuel tank, generator, and gear pad foundations
- Foundation System: 46 helical piers
- Pier Capacity: 25 kips maximum load
- Shaft: 2.875 inch diameter with 0.217 inch wall
- Helix Configuration: 40 piers at 10-12-14; 6 piers at 10-12
- Soil Conditions: Soft existing fill in the upper 6 to 8 feet, with trace cobble and debris
- Site Conditions:Work adjacent to the existing parking garage, with utilities through the area
- Partners: Danis (general contractor), Shell & Meyer and Civil Solutions (engineers)
The Challenge
Backup power for a hospital has to sit on something dependable. The fuel tanks, generators, and gear pads all landed on ground carrying soft existing fill through the upper 6 to 8 feet, and traditional foundations have nothing to work with in material like that.
The parking garage next door raised the stakes. Excavating and installing near existing foundations puts the structures already there at risk, and utilities ran through the same area. The fill carried trace cobble and debris on top of all that, which is what makes a pier fight for depth on a site like this one
Key Project Details
helical piers installed for the new fuel tank, generator, and gear pad foundations
kips maximum load per pier
piers with a 10-12-14 helix configuration and 6 with a 10-12 configuration
The Solution: Helical Pier Foundation System
The Dwyer Company installed 46 helical piers under the new equipment foundations, each rated to a maximum load of 25 kips. Forty piers used a 10-12-14 helix configuration and six used 10-12, all on 2.875 inch shaft with a 0.217 inch wall. The piers advance through the soft fill and pick up bearing below it, so the tanks and generators sit on capacity rather than on the material near the surface.
Placement carried the rest of the work. Piers went in near the existing parking garage foundations without disturbing them, and the crew tracked utilities across the area at every location. Cobble and debris in the fill slowed individual piers, and the full layout still closed in five days.
The Impact
Equipment foundations off the fill
Every pier advanced past the soft existing fill in the upper 6 to 8 feet.
The parking garage left undisturbed
Pier installation carried load below grade beside the existing foundations without cutting in next to them.
Configuration matched to conditions
Two helix arrangements covered the range of loads and soils across the pier layout.
Five days on site
The full 46-pier scope was installed inside a five-day window.
Why Helical Piers?
Helical piers let The Dwyer Company set 46 equipment foundations beside a parking garage, through fill carrying cobble and debris.
- Bypasses soft fill – Piers advance past unsuitable material and land in the soil below it.
- Protects adjacent foundations – Load transfers below grade without an open cut beside existing footings.
- Configurable helix arrangement – Plate sizes are matched to the loads and the soils, so one system covers varied conditions across a site.
- Quick to install – Piers reach capacity as they go in, which suits short schedule windows on an operating campus.
Why Choose The Dwyer Company for structural integrity?
Deep History • Solid Choice
The Dwyer Company’s proven track record in commercial and industrial foundation systems made us the trusted partner for the new equipment foundations at Dayton Children’s. Working alongside Danis, Shell & Meyer, and Civil Solutions, our crew installed 46 helical piers beside an existing parking garage and finished in five days.
Have equipment foundations going in on a working campus?