10th Island Tiki Bar and Grill added a new patio structure at its Cincinnati property, on a lot boxed in by existing buildings and underlain by soft soils through the upper 10 feet. The Dwyer Company installed four helical piers to carry the new foundation, working with general contractor LinkedIn Solutions and engineer Advantage Group Engineers, Inc. Each pier was designed to support 10 kips of axial load. The piers reached bearing without an excavation alongside the neighboring structure.
Building an addition tight against a neighboring structure?
Quick Facts
- Cincinnati, Ohio
- Project Type: Commercial – New Construction
- Owner: 10th Island Tiki Bar and Grill
- Foundation System: Helical piers, four installed under the new patio structure
- Pier Capacity: 10 kips of axial load per pier
- Soil Conditions: Soft soils within the upper 10 feet
- Site Conditions: Tight access, existing structures adjacent to the work
- Partners: Linked Solutions (general contractor), Advantage Group Engineers, Inc (engineer)
The Challenge
The new patio structure needed a foundation on a lot that gave up little room. Soft soils ran through the upper 10 feet, leaving a shallow footing nothing dependable to bear on. The building next door sat close enough that digging down to competent material put its foundation at risk of undermining.
Access set the other half of the problem. Equipment could reach the pier locations only by coming through the property itself, so the order of installation had to be settled before the first pier turned.
Key Project Details
helical piers installed under the new patio structure
of axial load designed into each pier
The Solution: Helical Pier Foundation System
The Dwyer Company installed four helical piers to carry the new patio structure past the soft upper soils. Each pier was designed to support 10 kips of axial load. Helical piers turn into the ground instead of requiring an open cut, so the new foundation picked up its bearing with the soil beside the adjacent building left in place.
Access drove the sequence. The crew started at the furthest end of the property and worked back toward the entrance, which kept equipment off completed pier locations and out of finished work. Planning that order ahead of time is what made a tight site workable.
The Impact
Bearing below the soft soils
The piers extended through the upper 10 feet and picked up capacity in firmer material below.
The adjacent building stayed undisturbed
Installing on piers removed the excavation that would have run alongside the neighboring foundation.
Access handled by sequence
Starting at the far end of the property and working back to the entrance kept the crew moving on a site with almost no room to maneuver.
Capacity designed pier by pier
Each of the four piers was designed to support 10 kips of axial load.
Why Helical Piers?
Helical piers let The Dwyer Company reach bearing under 10 feet of soft soil on a lot where an open excavation was off the table.
- Bypasses soft upper soils – Piers turn past unsuitable material and land in the bearing stratum below.
- Works without an open cut – Installation leaves the soil supporting a neighboring foundation in place.
- Small equipment footprint – Compact machines reach pier locations on lots that larger rigs cannot enter.
- Designed capacity per pier – Each pier is specified to a load, so the foundation matches what the structure puts on it.
Why Choose The Dwyer Company for structural integrity?
Deep History • Solid Choice
The Dwyer Company’s proven track record in commercial and industrial foundation systems made us the trusted partner for the 10th Island Tiki Bar and Grill patio structure. Working alongside LinkedIn Solutions and Advantage Group Engineers, Inc, our crew set four helical piers on a boxed-in lot and gave the new foundation bearing below the soft soils.
Have a build going up against an existing structure?