How The Dwyer Company Restored a Failing Municipal Retaining Wall

During a critical roadway infrastructure upgrade, a municipality identified a significant slope instability issue involving a deteriorating retaining wall. The project posed a high-risk engineering challenge: imminent rockfall hazards threatening public safety and roadway integrity. In strategic partnership with Prus Construction, we engineered an accelerated soil nail and shotcrete stabilization framework. This intervention neutralized the immediate hazard and secured the structural foundation, enabling the successful completion of the primary roadway project.

Quick Facts

The Challenge

The primary project constraint involved the advanced structural degradation of the existing retaining wall. To facilitate a secure work zone, our team executed a complex site-access strategy, which included large-scale vegetation clearing and the strategic placement of fill material to establish stable platforms for aerial lifts. Throughout the mobilization phase, we maintained rigorous safety protocols to navigate active rockfall and unpredictable geological conditions.

The Solution: Accelerated Rockfall Mitigation & Slope Stabilization

The Dwyer Company designed and installed a soil nail and reinforced shotcrete facade that stabilized the deteriorating rock face and prevented further wall rotation. The solution required detailed pre-installation planning, precise survey of the 12′ minimum rock sockets, and careful scaling of loose debris to ensure worker safety and bond integrity.

The installation process involved establishing stable tiered work platforms, executing percussive drilling operations to engineering specifications (28-kip capacity), and implementing systematic proof testing to verify the pull-out resistance of the grout-to-ground bond.

The entire installation was completed in just 15 business days, allowing the project to maintain its aggressive construction timeline, providing the municipality with a permanently reinforced roadway corridor and eliminating the risk of catastrophic rockfall or global slope failure.

Key Project Details

individual soil nails designed to resist 28 kips of tension each.

0

minimum rock socket depth to ensure anchor point into competent strata.

0 foot

Top-down construction sequence to maintain slope stability during excavation.

in under accelerated mobilization allowed for vegetation clearing and platform prep

0 hours

Successful execution of proof tests exceeding 150% of the design load.

0 tests

Seamless integration of new soil nails with a reinforced shotcrete facing for a dual-action support system.

The Dwyer Company's Approach

Our approach to municipal infrastructure combines deep-seated geotechnical expertise with the agility required to handle emergency stabilization without halting primary construction progress.

  • Immediate Hazard Neutralization: Rapid scaling and netting secured the site for following trades.
  • Verified Structural Integrity: On-site tension testing provided empirical data that the wall met all safety factors.
  • Seamless Partner Coordination: Integrated workflows with Prus Construction prevented logistical bottlenecks.
  • Geotechnical Precision: Expert drilling through unpredictable Ohio shale and limestone ensured 100% of nails hit target depth.
  • Long-Term Durability: The shotcrete and nail combination offers a decades-long service life with minimal maintenance.

The Impact

The solution restored safety and project continuity by providing structural redundancy, protecting the public, and preserving the project schedule.

Economic Efficiency

A cost-effective solution that utilized soil nailing to avoid the massive mobilization and expense of a full wall replacement.

Schedule Security

Completed without delays that would have cascaded through subsequent paving and utility construction phases.

Critical Achievement

Most importantly, the stabilization secured a vital transportation artery for Cincinnati residents, turning a potential disaster into a reinforced asset.

Why Choose The Dwyer Company for structural integrity?

Deep History • Solid Choice

The Dwyer Company’s proven track record in commercial and industrial foundation systems made us the trusted partner for this critical infrastructure project. Our team’s technical expertise, advanced equipment, and commitment to precision execution delivered a foundation system that will support decades of heavy industrial use.

Call The Dwyer Company and one of our experts will get you taken care of with an accurate inspection quote!

Call The Dwyer Company and one of our experts will get you taken care of with an accurate inspection quote!